For Pennsylvania pond and lakefront owners. Every fact carries the date we checked it.
Pond & Shore PAlakepennsylvania.us Check my project
Educational summary, not legal or engineering advice. Confirm with the agency before you start. Checked Oct 4, 2026.

Permit plan · Shoreline wall, riprap or bank repair

Your permit plan: Shoreline wall, riprap or bank repair

Based on your answers. Cards are in the order you'll usually need them. Checked Oct 4, 2026.

Your answers (change any of them)
  1. Who owns the water and the lakebed? A federal reservoir (Army Corps of Engineers) · change
  2. Is this a repair or something new? Not sure · change
  3. Will any of the work be in a wetland (marsh, swamp or wet meadow) or place fill in one? No · change
  4. How long is the stretch of bank you'll work on? 500 linear feet or less · change
State

Chapter 105: your project is a water obstruction

DEP, or your county conservation district if it has Chapter 105 delegation

Under Pennsylvania's Chapter 105 rules, a "body of water" includes any natural or artificial lake or pond, and a "water obstruction" includes a pier, wharf, wall, fill or other structure in, along, across or projecting into it. For ponds and lakes, a structure counts if, at normal pool level, it is in the water or touching the water's edge. The rules cover temporary structures as well as permanent ones. DEP says any change to a pond's cross-section that is not maintenance, such as a new dock, pier or island or making the pond bigger, needs a water obstruction and encroachment permit.

Checked Oct 4, 2026 · Source: 25 Pa. Code § 105.1, Definitions This may be outdated

State

General Permit 3 (GP-3): bank rehabilitation and protection

DEP or your delegated county conservation district

Form: GP-3, 3150-PM-BWEW0503

Fee: $250

General Permit 3 (GP-3) covers bank rehabilitation and bank protection, limited to 500 linear feet along a single reach, and may not be registered more than once to extend a project. It is not for use in wetlands. DEP describes the limit as measured along a stream channel, so ask DEP or your delegated conservation district whether a lakeshore project fits. The registration fee in the regulation is $250.

Checked Oct 4, 2026 · Source: Chapter 105 General Permits; fees from 25 Pa. Code § 105.13(c)(2) This may be outdated

State

Erosion and sediment control

Your county conservation district (for DEP)

Any earth disturbance needs erosion and sediment control practices (BMPs). A written erosion and sediment control plan is required once the disturbance reaches 5,000 square feet (or if the work could discharge to a High Quality or Exceptional Value water), and it must be kept on site. Disturbing 1 acre or more generally needs an NPDES permit for construction stormwater. County conservation districts review these plans and may charge a review fee.

Checked Oct 4, 2026 · Source: Frequently Asked Questions: Erosion and Sediment Control (rev. Aug 12, 2026), FAQ #5 This may be outdated

State

PA One Call (811) before you dig

Pennsylvania One Call System

Timing: Notify between 3 and 10 business days before digging.

If you will dig with powered equipment, Pennsylvania law requires notice to PA One Call (call 811 or file online) at least 3 and no more than 10 business days before digging, and this applies to homeowners on their own land. Work may not start before the third business day after notice; weekends and legal holidays do not count. The service is free for homeowners. A contractor must make its own call: ask for its PA One Call serial number.

Checked Oct 4, 2026 · Source: PA One Call: Homeowner FAQs; PA Act 287 as amended This may be outdated

Info

Not sure which permit fits? Ask first

DEP regional office or your delegated conservation district

Ask DEP or your delegated conservation district before you register or build. Many small projects in or along Pennsylvania waters qualify for one of DEP's Chapter 105 general permits (GPs), registered with DEP or with a county conservation district that has Chapter 105 delegation. DEP or the district can only authorize a project that meets every term and condition of the general permit, so check the terms before you register. DEP prefers online registration through ePermitting, and conservation districts may charge their own review fee on top of the registration fee.

Checked Oct 4, 2026 · Source: Chapter 105 General Permits This may be outdated

Also check

Owner

Army Corps lake: ask the project office first

U.S. Army Corps of Engineers (the lake's project office)

Ask the lake's Corps project office first; Corps shoreline rules apply. At lakes the U.S. Army Corps of Engineers manages, private docks and other private shoreline uses are allowed only in areas the lake's Shoreline Management Plan designates, and not at all on lakes where construction began after December 13, 1974 or where no private uses existed by then (older permitted facilities can continue).

Checked Oct 4, 2026 · Source: 36 CFR § 327.30, Shoreline Management on Civil Works Projects This may be outdated

A summary, not legal or engineering advice. The regulation, the permit documents and the product label control. Confirm with the agency before you start.

Pros for this work

Optional. We use it only to show pros who serve your area. It isn't saved with your plan.

Get this plan as a PDF, $9

Your cards plus a timeline counted back from your start date, a document checklist for each permit, a call list with links, questions to ask contractors and a tracker. Delivered instantly.

This is not a permit or an application. We don't file anything for you. Agency fees are paid only to the agency.

Have a credit code?

Pond & Shore PA plan · lakepennsylvania.us/plan/25380 · Checked Oct 4, 2026

Get PDF ($9)