Permit guide · Dock, pier, lift or boathouse
Do I need a permit to build a dock in Pennsylvania?
Short answer: Usually yes. A dock, pier or boathouse in or touching any Pennsylvania pond or lake is a regulated "water obstruction" under Chapter 105. Small docks of 750 square feet or less can often use DEP's GP-2 general permit, repairs can use GP-11, and bigger projects need an individual permit. Whoever owns the lakebed must agree too.
Checked Oct 4, 2026 · Source: Chapter 105 General Permits; fees from 25 Pa. Code § 105.13(c)(2) This may be outdated
Why a dock needs a permit. Under Pennsylvania's Chapter 105 rules, a "body of water" includes any natural or artificial lake or pond, and a "water obstruction" includes a pier, wharf, wall, fill or other structure in, along, across or projecting into it. For ponds and lakes, a structure counts if, at normal pool level, it is in the water or touching the water's edge. The rules cover temporary structures as well as permanent ones. DEP says any change to a pond's cross-section that is not maintenance, such as a new dock, pier or island or making the pond bigger, needs a water obstruction and encroachment permit.
Checked Oct 4, 2026 · Source: 25 Pa. Code § 105.1, Definitions This may be outdated
Small docks: General Permit 2. General Permit 2 (GP-2) covers the installation, modification and maintenance of small docks of 750 square feet or less and boat launching ramps; other size restrictions may apply. The registration fee in the regulation is $175. Many small projects in or along Pennsylvania waters qualify for one of DEP's Chapter 105 general permits (GPs), registered with DEP or with a county conservation district that has Chapter 105 delegation. DEP or the district can only authorize a project that meets every term and condition of the general permit, so check the terms before you register. DEP prefers online registration through ePermitting, and conservation districts may charge their own review fee on top of the registration fee. Read the GP-2 terms before you register, and register before you build.
Checked Oct 4, 2026 · Source: Chapter 105 General Permits This may be outdated
Repairing or replacing a dock you already have. General Permit 11 (GP-11) covers maintenance, testing, repair, rehabilitation or replacement of existing, currently serviceable water obstructions and encroachments, allowing only minor changes with minimal environmental impact. The registration fee in the regulation is $750 plus disturbance review fees where they apply.
Checked Oct 4, 2026 · Source: Chapter 105 General Permits; fees from 25 Pa. Code § 105.13(c)(2) This may be outdated
Bigger docks, boathouses and anything with fill. Chapter 105 work that doesn't qualify for a waiver or a general permit needs an individual water obstruction and encroachment permit through DEP's Joint Permit Application, reviewed by DEP's regional office or a delegated conservation district. DEP recommends a pre-application meeting. In most cases the same application also covers the federal Army Corps authorization. Small dam across a stream: DEP fees from $1,750 plus disturbance fees; confirm with DEP. Fill or dredging in waters or wetlands may also need federal (Army Corps) authorization, usually via DEP.
Checked Oct 4, 2026 · Sources: Apply for a Water Obstruction and Encroachment Joint Permit (Chapter 105); Introduction to Ponds and Chapter 105 (FAQ: non-jurisdictional dam across a stream); Pennsylvania State Programmatic General Permit-7 (PASPGP-7), Part I and Part VI (dated April 27, 2026) This may be outdated
Who owns the water comes first. On a community lake, the association's rules and approval come first, and they don't replace state permits. On a lake owned by a utility or company, ask the owner about its shoreline rules before you apply. On an Army Corps lake: At lakes the U.S. Army Corps of Engineers manages, private docks and other private shoreline uses are allowed only in areas the lake's Shoreline Management Plan designates, and not at all on lakes where construction began after December 13, 1974 or where no private uses existed by then (older permitted facilities can continue). On a state park or Fish and Boat Commission lake, the managing agency decides first. On a natural lake or river the state owns: On a stream, river or lake that has been legally determined to be a navigable water of the Commonwealth, where the state owns the bed, a dock or other permitted structure also needs a Submerged Lands License Agreement with DEP. DEP publishes the lists of covered waters. The regulation sets a $250 annual charge for a private recreational dock owned and used only by the adjacent riparian owners, and no charge when the dock is built under a general permit; DEP makes the final determination.
Checked Oct 4, 2026 · Sources: 36 CFR § 327.30, Shoreline Management on Civil Works Projects; Submerged Lands License Agreement This may be outdated
Your township, too. Your county, township or municipal government may have its own rules, codes or permits for pond construction or maintenance, so check with every level of local government before you start, especially for a new pond.
Checked Oct 4, 2026 · Source: Pond Agencies and Permits in Pennsylvania: Local Government (updated May 19, 2025) This may be outdated
What to have ready: the dock's size in square feet and a simple plan; photos of the shoreline; who owns the lakebed and any owner or association approval; and, for anything beyond a small dock, a site plan and location map.
Questions people ask
Do I need a permit for a floating or seasonal dock?
Yes, usually. Under Pennsylvania's Chapter 105 rules, a "body of water" includes any natural or artificial lake or pond, and a "water obstruction" includes a pier, wharf, wall, fill or other structure in, along, across or projecting into it. For ponds and lakes, a structure counts if, at normal pool level, it is in the water or touching the water's edge. The rules cover temporary structures as well as permanent ones. DEP says any change to a pond's cross-section that is not maintenance, such as a new dock, pier or island or making the pond bigger, needs a water obstruction and encroachment permit. Small docks often fit GP-2: GP-2: small docks of 750 square feet or less and launch ramps; $175 registration. Checked Oct 4, 2026
Checked Oct 4, 2026 · Sources: 25 Pa. Code § 105.1, Definitions; Chapter 105 General Permits; fees from 25 Pa. Code § 105.13(c)(2) This may be outdated
How much does a dock permit cost in Pennsylvania?
For a small dock under GP-2, the registration fee in the regulation is $175, and conservation districts may add a review fee. Individual permits start at $1,750 plus disturbance fees. On state-owned navigable waters there may also be an annual Submerged Lands charge: On state-owned navigable waters, docks also need a Submerged Lands License Agreement. Checked Oct 4, 2026
Checked Oct 4, 2026 · Sources: Chapter 105 General Permits; Introduction to Ponds and Chapter 105 (FAQ: non-jurisdictional dam across a stream); Submerged Lands License Agreement This may be outdated
Who issues dock permits?
DEP, or your county conservation district if it has Chapter 105 delegation. Many small projects in or along Pennsylvania waters qualify for one of DEP's Chapter 105 general permits (GPs), registered with DEP or with a county conservation district that has Chapter 105 delegation. DEP or the district can only authorize a project that meets every term and condition of the general permit, so check the terms before you register. DEP prefers online registration through ePermitting, and conservation districts may charge their own review fee on top of the registration fee. Checked Oct 4, 2026
Checked Oct 4, 2026 · Source: Chapter 105 General Permits This may be outdated
Do I need a permit to repair my dock?
Repairs and replacements of an existing, serviceable dock can usually use GP-11. General Permit 11 (GP-11) covers maintenance, testing, repair, rehabilitation or replacement of existing, currently serviceable water obstructions and encroachments, allowing only minor changes with minimal environmental impact. The registration fee in the regulation is $750 plus disturbance review fees where they apply. Checked Oct 4, 2026
Checked Oct 4, 2026 · Source: Chapter 105 General Permits; fees from 25 Pa. Code § 105.13(c)(2) This may be outdated
Our lake association owns the lake. Do I still need a state permit?
Yes. The association's approval comes first, but it doesn't replace state permits. Docks, piers, walls and fill in or touching any pond or lake are regulated 'water obstructions'. Checked Oct 4, 2026
Checked Oct 4, 2026 · Source: 25 Pa. Code § 105.1, Definitions This may be outdated
Do I need a Submerged Lands License for my dock?
Only on waters legally determined to be navigable waters of the Commonwealth. On a stream, river or lake that has been legally determined to be a navigable water of the Commonwealth, where the state owns the bed, a dock or other permitted structure also needs a Submerged Lands License Agreement with DEP. DEP publishes the lists of covered waters. The regulation sets a $250 annual charge for a private recreational dock owned and used only by the adjacent riparian owners, and no charge when the dock is built under a general permit; DEP makes the final determination. Checked Oct 4, 2026
Checked Oct 4, 2026 · Source: Submerged Lands License Agreement This may be outdated
Can I build a private dock on an Army Corps lake?
At lakes the U.S. Army Corps of Engineers manages, private docks and other private shoreline uses are allowed only in areas the lake's Shoreline Management Plan designates, and not at all on lakes where construction began after December 13, 1974 or where no private uses existed by then (older permitted facilities can continue). Checked Oct 4, 2026
Checked Oct 4, 2026 · Source: 36 CFR § 327.30, Shoreline Management on Civil Works Projects This may be outdated
Where to apply and read more
- DEP Chapter 105 General Permits
- DEP Introduction to Ponds and Chapter 105
- Map of conservation districts with Chapter 105 delegation
- 25 Pa. Code § 105.13 (fees)
- DEP Submerged Lands License Agreement
- 36 CFR § 327.30 (Corps shoreline management)
Related
Shoreline walls and riprapSand beachesApril at the pondLake boards
Paperwork help
Planning the work? Get your Project Plan PDF ($9) or the Owner's Handbook ($12).
This is not a permit or an application. We don't file anything for you. Agency fees are paid only to the agency.
Find a pro
Listings are paid and self-described; check licenses and insurance yourself.