For Pennsylvania pond and lakefront owners. Every fact carries the date we checked it.
Pond & Shore PAlakepennsylvania.us Check my project
Educational summary, not legal or engineering advice. Confirm with the agency before you start. Checked Oct 4, 2026.

Permit plan · Dock, pier, lift or boathouse

Your permit plan: Dock, pier, lift or boathouse

Based on your answers. Cards are in the order you'll usually need them. Checked Oct 4, 2026.

Your answers (change any of them)
  1. Who owns the water and the lakebed? A lake owned by our community or association · change
  2. What are you doing? Not sure · change
State

Chapter 105: your project is a water obstruction

DEP, or your county conservation district if it has Chapter 105 delegation

Under Pennsylvania's Chapter 105 rules, a "body of water" includes any natural or artificial lake or pond, and a "water obstruction" includes a pier, wharf, wall, fill or other structure in, along, across or projecting into it. For ponds and lakes, a structure counts if, at normal pool level, it is in the water or touching the water's edge. The rules cover temporary structures as well as permanent ones. DEP says any change to a pond's cross-section that is not maintenance, such as a new dock, pier or island or making the pond bigger, needs a water obstruction and encroachment permit.

Checked Oct 4, 2026 · Source: 25 Pa. Code § 105.1, Definitions This may be outdated

State

General Permit 2 (GP-2): small docks and launch ramps

DEP or your delegated county conservation district

Form: GP-2, 3150-PM-BWEW0502 (register through DEP ePermitting, DEP's preferred route)

Fee: $175

General Permit 2 (GP-2) covers the installation, modification and maintenance of small docks of 750 square feet or less and boat launching ramps; other size restrictions may apply. The registration fee in the regulation is $175. Small projects often fit a DEP general permit, but only if they meet every term of it.

What to have ready

  • Read the GP-2 permit terms (DEP eLibrary, 3150-PM-BWEW0502) and check your dock fits them before you register.
  • Your dock's total area in square feet, and a simple plan of it.
  • Who owns the lakebed, and any owner or association approval (see the owner card).

Checked Oct 4, 2026 · Source: Chapter 105 General Permits This may be outdated

State

General Permit 11 (GP-11): repair or replace an existing structure

DEP or your delegated county conservation district

Form: GP-11, 3150-PM-BWEW0511

Fee: $750

General Permit 11 (GP-11) covers maintenance, testing, repair, rehabilitation or replacement of existing, currently serviceable water obstructions and encroachments, allowing only minor changes with minimal environmental impact. The registration fee in the regulation is $750 plus disturbance review fees where they apply.

What to have ready

  • Photos of the existing structure as it is today.
  • What will change (materials, size, footprint), even if minor.

Checked Oct 4, 2026 · Source: Chapter 105 General Permits; fees from 25 Pa. Code § 105.13(c)(2) This may be outdated

State

Individual Chapter 105 permit (Joint Permit Application)

DEP (regional office), or your delegated county conservation district

Fee: Small dam across a stream: DEP fees from $1,750 plus disturbance fees; confirm with DEP.

Chapter 105 work that doesn't qualify for a waiver or a general permit needs an individual water obstruction and encroachment permit through DEP's Joint Permit Application, reviewed by DEP's regional office or a delegated conservation district. DEP recommends a pre-application meeting. In most cases the same application also covers the federal Army Corps authorization. Small dam across a stream: DEP fees from $1,750 plus disturbance fees; confirm with DEP.

What to have ready

  • Ask DEP for a pre-application meeting; DEP recommends it.
  • Expect a site plan, a location map, photos and a project description; larger projects need more (25 Pa. Code § 105.13).

Checked Oct 4, 2026 · Sources: Apply for a Water Obstruction and Encroachment Joint Permit (Chapter 105); Introduction to Ponds and Chapter 105 (FAQ: non-jurisdictional dam across a stream); Pennsylvania State Programmatic General Permit-7 (PASPGP-7), Part I and Part VI (dated April 27, 2026) This may be outdated

Info

Not sure which permit fits? Ask first

DEP regional office or your delegated conservation district

Ask DEP or your delegated conservation district before you register or build. Many small projects in or along Pennsylvania waters qualify for one of DEP's Chapter 105 general permits (GPs), registered with DEP or with a county conservation district that has Chapter 105 delegation. DEP or the district can only authorize a project that meets every term and condition of the general permit, so check the terms before you register. DEP prefers online registration through ePermitting, and conservation districts may charge their own review fee on top of the registration fee.

Checked Oct 4, 2026 · Source: Chapter 105 General Permits This may be outdated

Also check

Owner

Your association comes first

Your lake community or association

Your association's rules and approvals come first; they don't replace state permits. Ask for its approval in writing before you apply to the state.

A summary, not legal or engineering advice. The regulation, the permit documents and the product label control. Confirm with the agency before you start.

Pros for this work

Optional. We use it only to show pros who serve your area. It isn't saved with your plan.

Get this plan as a PDF, $9

Your cards plus a timeline counted back from your start date, a document checklist for each permit, a call list with links, questions to ask contractors and a tracker. Delivered instantly.

This is not a permit or an application. We don't file anything for you. Agency fees are paid only to the agency.

Have a credit code?

Pond & Shore PA plan · lakepennsylvania.us/plan/20hc · Checked Oct 4, 2026

Get PDF ($9)