Educational summary, not legal or engineering advice. Confirm with the agency before you start. Checked Oct 4, 2026.

Permit plan · Sand beach or fill at the water's edge

Your permit plan: Sand beach or fill at the water's edge

Based on your answers. Cards are in the order you'll usually need them. Checked Oct 4, 2026.

Your answers (change any of them)
  1. Who owns the water and the lakebed? A natural lake or river open to the public · change
  2. Where will the sand or fill go? Only on dry land, not touching the water's edge · change
  3. Is that land in a wetland or a stream's floodway? No · change
State

Erosion and sediment control

Your county conservation district (for DEP)

Any earth disturbance needs erosion and sediment control practices (BMPs). A written erosion and sediment control plan is required once the disturbance reaches 5,000 square feet (or if the work could discharge to a High Quality or Exceptional Value water), and it must be kept on site. Disturbing 1 acre or more generally needs an NPDES permit for construction stormwater. County conservation districts review these plans and may charge a review fee.

Checked Oct 4, 2026 · Source: Frequently Asked Questions: Erosion and Sediment Control (rev. Aug 12, 2026), FAQ #5 This may be outdated

State

PA One Call (811) before you dig

Pennsylvania One Call System

Timing: Notify between 3 and 10 business days before digging.

If you will dig with powered equipment, Pennsylvania law requires notice to PA One Call (call 811 or file online) at least 3 and no more than 10 business days before digging, and this applies to homeowners on their own land. Work may not start before the third business day after notice; weekends and legal holidays do not count. The service is free for homeowners. A contractor must make its own call: ask for its PA One Call serial number.

Checked Oct 4, 2026 · Source: PA One Call: Homeowner FAQs; PA Act 287 as amended This may be outdated

State

Submerged Lands License Agreement (navigable waters only)

Pennsylvania Department of Environmental Protection (DEP)

Fee: On state-owned navigable waters, docks also need a Submerged Lands License Agreement.

On a stream, river or lake that has been legally determined to be a navigable water of the Commonwealth, where the state owns the bed, a dock or other permitted structure also needs a Submerged Lands License Agreement with DEP. DEP publishes the lists of covered waters. The regulation sets a $250 annual charge for a private recreational dock owned and used only by the adjacent riparian owners, and no charge when the dock is built under a general permit; DEP makes the final determination.

Checked Oct 4, 2026 · Source: Submerged Lands License Agreement This may be outdated

Also check

A summary, not legal or engineering advice. The regulation, the permit documents and the product label control. Confirm with the agency before you start.

Pros for this work

Optional. We use it only to show pros who serve your area. It isn't saved with your plan.

Get this plan as a PDF, $9

Your cards plus a timeline counted back from your start date, a document checklist for each permit, a call list with links, questions to ask contractors and a tracker. Delivered instantly.

This is not a permit or an application. We don't file anything for you. Agency fees are paid only to the agency.