Permit plan · Lower or drain the water

Your permit plan: Lower or drain the water

Based on your answers. Cards are in the order you'll usually need them. Checked Oct 4, 2026.

Your answers (change any of them)
  1. Who owns the water and the lakebed? A federal reservoir (Army Corps of Engineers) · change
  2. Is the water body larger than 1 acre? No, 1 acre or smaller · change
  3. Does the project need another state permit, such as a dam permit or a water obstruction permit? Yes · change
  4. Why are you lowering the water? Not sure · change
State

PFBC Permit to Draw Off Water from Impoundments

PFBC, reviewed with DEP dam safety staff

Form: PFBC Application to Draw Off Water from Impoundments (updated March 2026; file pfbc-dd01)

Timing: Apply at least 30 days before the drawdown.

Lowering the water in a pond, lake or other impoundment needs PFBC's Permit to Draw Off Water from Impoundments when the water body is larger than 1 acre, or at any size when the project needs another state permit (for example a DEP dam permit or a water obstruction and encroachment permit). Apply at least 30 days before the drawdown; there is no fee. PFBC and DEP's dam safety staff review it together. PFBC warns that drawing a pond down after turtles, frogs and salamanders begin hibernating in the mud can kill them.

What to have ready

  • The impoundment's name, county, municipality and receiving stream.
  • The DEP dam ID number, if the dam has one.
  • Surface area, maximum depth, and how far below normal pool you'll lower it.
  • Method (valve, gate, stoplog, siphon or pump) and the proposed dates.
  • Where any fish will be moved.
  • The purpose; for dam, dredging, shoreline, beach or dock work, the DEP supplement with plans and photos.
  • A map that locates the impoundment (USGS topographic or PennDOT county highway map).

Checked Oct 4, 2026 · Source: Apply to Draw Off Water from Impoundments This may be outdated

Also check

Owner

Army Corps lake: ask the project office first

U.S. Army Corps of Engineers (the lake's project office)

Ask the lake's Corps project office first; Corps shoreline rules apply. At lakes the U.S. Army Corps of Engineers manages, private docks and other private shoreline uses are allowed only in areas the lake's Shoreline Management Plan designates, and not at all on lakes where construction began after December 13, 1974 or where no private uses existed by then (older permitted facilities can continue).

Checked Oct 4, 2026 · Source: 36 CFR § 327.30, Shoreline Management on Civil Works Projects This may be outdated

A summary, not legal or engineering advice. The regulation, the permit documents and the product label control. Confirm with the agency before you start.

Pros for this work

Optional. We use it only to show pros who serve your area. It isn't saved with your plan.

Get this plan as a PDF, $9

Your cards plus a timeline counted back from your start date, a document checklist for each permit, a call list with links, questions to ask contractors and a tracker. Delivered instantly.

This is not a permit or an application. We don't file anything for you. Agency fees are paid only to the agency.

Have a credit code?

Pond & Shore PA plan · lakepennsylvania.us/plan/2x34r · Checked Oct 4, 2026

Get PDF ($9)